文林 发表于 2020-5-27 08:41

日立HGP电梯安装调试手册

本资料介绍HGP型电梯,该梯种以集成了变频控制和逻辑控制的EV-ECD01(MCUB)控制板、SCL串行通讯系统和RD-DMS01变频门机系统作为电气的关键组成部分,并基本使用了GVF-Ⅱ型电梯的机械系统。资料编写目的:随着HGP电梯的开发成功,在工程方面需要提供安装、调试、维修和保养各项工作的技术说明。本资料是根据HGP电梯的技术特点,列出电梯在工程环节中所需使用的资料。HGP电梯电气系统最大的特点是将GVF-II电梯中的FMT(逻辑控制),TD3100(变频控制),SCL-A(串行通讯)三个模块功能集成在一个板(MCUB板)上,现场操作方法上有较多不同,这方面的内容请参考HGP电梯《MCUB板使用说明》、《艾默生变频器专用操作面板使用说明》和手持编程器(GHP)《GHP使用说明》;机械方面主要是使用同步电机,采用了2:1吊挂方式,轿顶反绳轮、对重反绳轮、机房主机安装上存在不同,该部分的作业可参照NPM进行。由于HGP电梯在电气控制原理上与GVF-Ⅱ、GVF-Ⅲ电梯有较多的相同点,又基本使用NPM电梯的机械系统,所以本资料对于相同点不再进行叙述,只作出说明“与XX电梯保持一致”。本资料基本内容:(1) HGP电梯构成和技术特点。(2) 安装部分。电气回路图的使用说明;控制柜及轿顶电器箱等重要电气部分的名称、功能介绍;工程大、细线及地线的安装等。(3) 调试部分。运行前需进行检查的电梯各项安装情况,控制柜绝缘测试、低速试运行、变频门机的调试运行、层高测定操作、高速运行调试、平层精度调整等。 如有修改意见,请填写附页的《HGP电梯调试手册改进意见表》(复印有效),传真或直接交由工程本部工程技术科以作修改。   一.HGP电梯的技术概述··············································4    1.技术构成及特点··················································4   2. HGP与NPM、GVF-Ⅱ的简单比较········································4      2.1机械部分的不同点············································5      2.2电气方面不同部分的简单比较···································6      3.HGP电梯的规格················································7二.HGP电梯机械部分的安装···········································7三.HGP电梯电气部分的安装···········································7    1.电气回路图的说明·················································7    1.1电气回路图的类别和内容·······································7    1.2控制柜对外的接线代号及用途···································8    1.3电气回路图的读图方法·········································8    2.电梯电源参数······················································10    3.控制柜概要······················································10    3.1控制柜尺寸及主要部件的安装图·································103.2控制柜内部主要部件的名称和功能·······························113.3继电器RYBD板元件布置图···········································11    4.轿顶电器箱元件布置图············································125.井道内器件、电缆的安装··········································13      5.1井道内器件的安装与接线······································13      5.2井道内电缆的安装············································13    6. 厅外召唤箱的安装、接线及DIP开关的设置·························14    7. 接地线作业·····················································14    7.1控制柜内接地线回路图········································14    7.2系统地线敷线图··············································15    8. 其他敷线························································15四.运行调试···························································15    1. 运行前准备······················································15    1.1运行前检查·····················································151.2控制柜绝缘测试·················································15      1.2.1准备工作··················································15         1.2.2测试方法··················································16         1.2.3各回路绝缘标准阻值········································16    1.3电压测试························································17    1.4混杂电压检查····················································172. 变频门机的调整···················································17   2.1机械调整···················································17 2.2电气系统介绍····················································19    3. 低速试运行······················································213.1磁极位置校正····················································21      3.2低速运行··················································213.3安全回路的确认驶················································223.4变频门机的门宽自检测············································23        4. 高速试运行前检查和调整··········································23    5. 高速试运行······················································235.1层高测定························································235.1.1层高测定运行前的确定··········································23    5.1.2层高测定的操作顺序·············································23    5.2高速试运行······················································23    5.3电梯对重配置····················································245.4平层调整························································24          5.5起动补偿调整····················································245.6 轿内负荷检测设置···············································24    6. 起动舒适感调整··················································25    7. 功能确认························································25五.MCUB板使用说明····················································25      1. MCUB板简介·····················································25      2. 小键盘介绍·····················································27      2.1硬件介绍·······················································27      2.2一般操作·······················································27      2.3各状态解释·····················································28六.艾默生变频器专用操作面板使用说明···································311. 操作面板硬件说明················································31      2. 按键功能说明···················································323. 指示说明························································324. 键盘操作说明···················································33七.手持编程(GHP)操作说明············································34      1.手持编程(GHP)硬件说明··········································34      2.按键功能说明·····················································35      3.GHP操作流程简介················································36八.故障说明···························································36      1.电梯故障的内部处理方式···········································36      2.电梯故障代码表···················································37      3.变频器故障代码表·················································38   九.HGP乘客电梯标准规格表················································39
页: [1]
查看完整版本: 日立HGP电梯安装调试手册

免责声明:电梯阁所发布的一切电梯相关软件、调试说明、图纸等资料仅限用于学习和研究目的;不得将上述内容用于商业或者非法用途,否则,一切后果请用户自负。本站信息来自网络用户发表,版权争议与本站无关。您必须在下载后的24个小时之内,从您的硬盘中彻底删除上述内容。如果您喜欢该资料,请支持正版,得到更好的正版服务。如有侵权请邮件联系我们处理。

Mail To:diantige@126.com